If Synchronize with Preparation has been run, you can change the refresh status on operation and material rows in the column Refresh status. This can only be made after the synchronization and before the order is saved. This is useful if you want to reset a row from Deleted to Unchanged. Other selections are not used.
Changing the Refresh status.