The Level List tab

The Level List tab shows all incorporated parts at all levels.

For the parts you can see part type, quantity, total setup time/unit time per part, material cost and the total setup cost, unit cost and subcontracting cost per part. At the bottom of the list you will see a total sum of the incorporated columns. Time is shown in the unit entered in the setting Time unit for setup time and unit time for operations, but this can be changed using the Info menu.