You are here: Manufacturing > Parts > BOM / Operation List > Printout Samples

Printout Samples

Here you can see a printout sample of the default list Operation / material.

In this example, the Instructions and Tools alternatives are unchecked, and all part types are checked. In this particular case, only part types M (Manufactured) and S (Stocked) parts appear in the selected part interval. You can also see the part's current revision in the list.

For all parts that have preparations, the operation list displays the following information: Work center, Name, Time code (if applicable), Setup and Unit time (in the time unit configured in the system), for subcontracts you will instead see setup and unit cost (in the currency selected on the operation). The material list displays: Part number, Name, Quantity, Unit, Type, Standard price and For Operation.

If the setting Use positions in BOM lists? has been configured under the heading Preparation under the Manufacturing tab in the Settings procedure, the material list will also show information about the position at the far left of the BOM list.

help0043.gif

Sample of an Operation / material list.