Standard Operation Name

The standard operation name will be used by default as the operation name for this work center during preparations. For example, enter D for drilling, CUT for cutting, etc. If you leave this field empty, the work center’s name will be used by default. The operation name can always be changed for each preparation, if needed.

You can see a standard list of operation names in the SMS 797.