You are here: Manufacturing > Reporting > Operation Reporting > Other Work Center

Other Work Center

If a post-calculation should be calculated on another work center than the one selected during the preparation, you must check this box. A field called Actual work center will then open. This may be needed, for example, if you are adding an operation to a part. This option is unchecked by default.