You are here: Manufacturing > Parts > Work Center Analysis > Alternatives

Alternatives

Include Blocked Parts

Here you can choose to include blocked parts in the list.

Split Unit Time into Cycle Time and Ineffective Time

This selection loads the unit time from the operation and the ineffective from the work center and thereby calculates the cycle time. This alternative only exists for the list type Change work center. This alternative is only available if the setting Use ineffective time in the preparation, under Preparation under the Preparation tab in the Settings procedure, has been activated.