You are here: Manufacturing > Reporting > Comprehensive Reporting > Suggest Rest on Material

Suggest Rest on Material

This option is used to perform reporting using the planned material consumption for the part. This option is like quick / rest reporting on the operation. Once you have loaded the part, you can modify the suggested material consumption before reporting.

If you select Suggest rest on material, you cannot select the option Material follows operation. The suggested material to be reported will then be the rest on material and not the operation's material quantity.

Multiple Stock Locations

For all parts with multiple stock locations, once reporting is made the system will create a withdrawal for the consumed quantity from the location with the earliest arrival date.