You are here: Manufacturing > Reporting > Operation Reporting > Cost to Report

Cost to Report

If this is a subcontract you report cost instead of time, containing information about the current report number that is loaded from the operation row in the preparation. The unit will be changed to the company currency, such as SEK, etc. When reporting shipped quantity the subcontract costs are not reported, then these fields show zero and are greyed out. Instead, the cost is reported when you report the quantity that has returned from the subcontractor.