Time to Report

Enter the actual time for the operation. The operation time is the setup time plus the unit time for all the parts. The post-calculation will then display a total processing cost including both the setup cost and the unit cost. However, if you want the post-calculation to separate these costs, you should only enter the total unit time in this field.