The Summary Tab
The Summary tab shows a list containing the totals from the other lists.
The Summary tab in the Post-Calculation window.
The summary shows two alternatives of the post-calculation for the highest level part. One is based on one part and one is based on the lot size for which the post-calculation was ordered. Under the Summary tab the post-calculation is shown and one is based on planned values and one is based on the reported values. The incorporated records included in the summary are derived from the total sums of the other lists (see the image above that includes explanations under the link).
The summary consists of the following costs.
- Manufacturing cost that consists of Material + Subcontracting + Manufacturing.
- Cost price that consists of Manufacturing cost + Sales overhead.
- Information about the respective share of the Manufacturing cost that applies to Material (%), Manufacturing (%) and Subcontracting (%).
- The throughput time in work days between the earliest “started” reporting and the last “finished” reporting for the operation.
- Worked hours. If you use the Recording Terminal you will also see "of which indirect time" if there is anything to report.
- Result (SEK/time). Shows a weighted mean or average value for the cost factors for planned and reported values. Under the last column called sales price, the results have been calculated according to the following formula:
where R = Result, VSales= Sales value, CMat = Material cost, CSubc= Subcontracting cost CManf-stocked = Total Manufacturing–stocked parts tLab = Labor time in hours.
- Value added is
where CManf=Total manufacturing cost, CSubc=Subcontracting cost, Csalesov=Sales overhead in percent and CSO=SO mark-up in currency.
- Quote Price that consists of Cost price + Profit mark-up (%).