The Operations tab is used to see detailed information about the cost of labor at operation level.
For all incorporated operations of the selected part you can see the following information: work center, quantity, setup time/unit time, setup cost, unit cost, subcontracting cost and total cost. This is shown per operation, per part and at the bottom as a total figure. This is the most detailed cost of labor list. Time is shown in the unit entered in the setting Time unit for setup time and unit time for operations, but this can be changed using the Info menu.