Finish

Under Finish in the part row, you enter the desired finish period. You can enter the period using the formats YYWW, YYWWD or YY-MM-DD. Once you have selected the part number, a period will be suggested based on today's date plus the throughput time in work days registered for this part via saved calculations. If no throughput time has been registered, today's date is always suggested by default. Once a simulation has been created, a start period is calculated based on the parameters that apply to the loading.

If you have set a period term for the part in the preparation, it will be taken into account here. Read more about how terms and conditions affect Loading Simulation under Alternate Preparations and Loading Simulation.