Extended Update for Operations
When using the Info menu (right-clicking in the operation rows) or using Alt+E, you can perform Extended update per operation.
The Info Menu.
When using the Extended update, you can make additional reportings described below. This window allows you to perform reporting equivalent to the reporting made in the Operation Reporting procedure. This window also shows information about Operation number, Part number (for which the operation was reported) and Planned work center.
Image of the Extended Update window.
The available fields are:
- Rest quantity - enter the quantity you want to configure as the rest quantity.
- Rejects - enter the quantity that shall be rejected. You can also select several reject codes using the button to the right of the field.
- Employee number - enter the operator’s employee number.
- Other work center - if a post-calculation should be calculated for another work center than the one selected during the preparation, you must check this box. A field called Actual work center will then open. Select the work center for which you want to calculate the post-calculation. This may be needed, for example, if you are adding an operation to a part.
- Setup time to report - if you want to report the setup time separately, enter it here. The setup time will then be reported separately in the Post-Calculation.
- Tool... - If the supplement Tool Management has been installed, you can also choose to update a tool list linked to an operation, and select an individual tool entity if needed. Read more under Tool Management in Comprehensive Reporting.