You are here: Inventory > Requirements Planning > Check Delivery Times > The Warnings Tab

The Warnings Tab

The Warnings tab is activated if there are errors from the preparation or part register.

The Warnings list will show any possible errors that occurred in the Preparation, mainly logical errors from the Preparation such as missing setup or unit times, or if an incorporated part is linked to an operation that is missing. It can also be errors from the part register, e.g. that a price is missing for an incorporated part. The total number of warnings appear at the bottom of the list.

If the supplement Tool Management is used, a check is made to see if the tools linked to the part are available. A warning is shown under the Warnings tab if you book a tool for the same time/period as there is an existing tool reservation. The check is performed only on the Special tools type.

The Warnings tab also exists in other procedures in the system, for example in the Register Manufacturing Order and Pre-Calculation procedures in the Manufacturing module.