Actual Hours
The actual hours show the actual time used per project. All cost types except for Material and Subcontracting can report the time used.
A special feature for the cot type Work is that it separately accounts for time consumption reported from manufacturing orders and indirect work as well as direct registered time.
- The hours loaded from the manufacturing orders are the reported hours on operations for orders that are linked to the project.
- Indirect work is loaded from the recorded hours for indirect work that at the time of the reporting were linked to the project.
- Direct registered time is loaded from the time reported in the Register Project Costs Directly procedure.