Costs

At the top of the section Costs, you will find three fixed cost types called Material, Subcontracting and Work. Below these fixed cost types you will find other cost types. How the values are loaded for the costs are described below.

How Are Costs Calculated?

The first three cost types, Material, Subcontracting and Work, load the planned costs from the manufacturing order that is linked to the project. It will in practice be a post-calculation for the project based on the registered manufacturing order.

The other cost types load the planned costs from the Budget tab. The reason for this is that these costs can never be loaded from an order, for example traveling expenses.