Open
Under Open, you can select the procedures that shall be opened automatically after the simulation, and in which you calculate the results of the simulation. The available alternatives are:
- Requirement Calculation - Opens the Requirement Calculation procedure, that by default calculates the material requirement for the parts included in the entire quote backlog at one level, plus actual orders. The requirement calculation performed here, always calculates the entire quote backlog. Previous active simulations are not taken into account.
- Loading - Opens the Loading Selection procedure, that by default calculates the total loading for the work centers that are registered as bottlenecks. The loading is calculated here on actual orders and quote rows that were selected for simulation. This alternative is selected by default. Please Note! Only the overloading is shown and only the work centers that have been configured as bottlenecks are included.
- None - Opens none of the abovementioned procedures.
- Both - Opens both of the abovementioned procedures and performs their calculations.