The Result tab is built like a T-account where the left portion of the account shows the actual costs and the right portion shows the actual income.
You can get the recorded time and its cost better specified in the project summary. In the Codes procedure in the Workshop Info you can now have one Cost type for each indirect code. This way these reportings can be managed separately. In this procedure you also find the Addition tab, used to register other wage base factors in MONITOR, like e.g. travel time and daily allowances, which can be separately specified in the project accounting. It is possible to link also these costs to projects and in that case use a Cost type in order to include this in the project accounting.
Based on the actual costs and income, the system calculates contribution margin/contribution ratio as well as the project result. This information is shown at the bottom of this tab.