The Result tab opens after you have clicked on Run in the Window functions. Here you will see the result after the new finish period calculation, based on loading plan and available material. In the upper portion of the tab, you can select a maximization level. You can also select a total for all order rows with or without consequences.
Under Show material and Show operations you can select the materials and operations that you want to display in the structure list based on different criterias.
In the lower portion of the window, you will find a structure list where you can see the result of the new finish period calculation for each order. If you have selected the alternative Loading under the Create tab, you will also see the new finish period for each incorporated operation. If you have selected the alternative Material under the Create tab, you will also see when the requirement emerges as well as a new arrival period for each incorporated material. You can update the fields New finish period for operations and New arrival period for material.
In the lower portion of the window, you will find a total of critical work centers and critical material in a separate structure list. This total is useful when the flow analysis is made for a larger range of orders.
You will find additional functions for the structure list by using the Info menu.