You are here: Manufacturing > Orders > Adding / Replanning > Create

Create

When you open this procedure, the cursor is automatically positioned in the Order number field under Create. This is where you select or enter a project or order number for which you want make an addition or perform replanning. An order that has been confirmed as delayed * is shown with this symbol . If a manufacturing order contains a configuration the button appears. This button is used to see the current configuration for the order in a separate window. A symbol for the part status is also shown here.

You can also decide whether to modify linked material or not. To modify linked material signifies, for example, if the start period of an operation with incorporated material is modified, then the period of the material is automatically adjusted as well. If there is a project linked to the order, it will be shown in the field to the left of the Order number.

In the Info menu using the right mouse button, you will find additional functions for the fields Project and Order number.

* An order confirmed as delayed can for example mean that the material will not arrive on time or that there is capacity problem (overload). It is also an indication to other users saying that the order will be delayed. You can also confirm orders as delayed in the procedures Register Manufacturing Order and Flow Analysis - Manufacturing. An order that has been confirmed as delayed will have the same symbol in the flow analysis procedures.